Project background and existing conditions

Pier 3 is the westernmost of three Port-owned piers situated on the Columbia River. This 16-acre pier is currently used for haulout, maintenance, and storage. 服务 offered include an 88-ton travel lift, long-term boat and trailer parking, 陆上船舶储存库, short-term vessel project areas (powered), 设备租赁. 

The Port of Astoria recently completed a 船坞 Feasibility Study that demonstrated the need for expanded services and infrastructure at the Port’s Pier 3 船坞. The Port is now developing a visionary 船厂总体规划 and implementation strategy that will bolster the 船坞’s financial health and support the development of Port infrastructure.

An existing conditions report was conducted to identify both existing 机会 and 约束 related to the physical and economic characteristics of the 船坞. 报告发现, with the necessary investments, the 船坞 is well-positioned to attract vessel maintenance projects from across the West Coast.

在此浏览报告: 船坞 Expansion Feasibility Study 2022

时间轴

设计工作室

11月15日, 2023, 利益相关者咨询小组, comprised of commercial fishermen, 供应商, 供应商, 和经纪人, met to identify a clear vision for the boatyard expansion and design. Taking into consideration existing conditions, 机会, 约束, 和愿望, the advisory group worked to develop several design concepts. The Port is now evaluating and refining these design concepts into one preferred alternative. 

下一个步骤

The Port will continue to engage with the advisory group to further refine the design concepts and identify a preferred alternative. Once this preferred alternative is established, the Port will develop a final plan and implementation strategy which will then be presented to the Port’s Board of 委员 in Spring 2024 for adoption and implementation.

 